John Innes Centre
Chiller Replacement
“MJS are very well organised, very competent and very efficient with excellent approach to health and safety.”
University of East Anglia
BMRC Service Upgrade
University of East Anglia
BMRC Service Upgrade
“This project related to partial refurbishments of live science facilities.
With their ethos MJS were best placed in the delivery of these works as they understood the science being undertaken had to be maintained and that their works needed to be completed in conjunction with keeping the research ongoing and all systems live. They took time in determining the appropriate methodologies required to ensure that research and licenced welfare conditions could be maintained within the appropriate parameters required. It was apparent from the outset that the time for planning of works would exceed the construction period, but this time has ensured that during construction no unforeseeable issues occurred.
With the management and logistics required for these works, and having the right team appointed beneath them to support these works, MJS Projects service has been second to none in the delivery of another successful project at the UEA. Where MJS excel is in taking these difficult technical projects and delivering them on time, in budget, to a high standard, and this is great recognition to all of the team at MJS.”
University of East Anglia
Biology & Science Fan Replacement
University of East Anglia
Biology & Science Fan Replacement
“Completed on time and to budget. A complicated job completed with little fuss; up front organisation and co-ordination with end user exceptional.”
University of East Anglia
Combined Heat & Power Enabling Works
University of East Anglia
Combined Heat & Power Enabling Works
“The CHP Enabling project was high risk in many regards and it’s successful delivery was critical to the University. MJS and their M&E partners delivered all aspects of this project in a safe, controlled and open manner protecting the University throughout. The work produced by MJS is always of the highest quality and their attention to detail sets them aside from other contractors of a similar size. They are continually striving to improve their performance and look to set up long term relationships rather than quick profits which fits with our preferred way of working. I have no hesitation in recommending their services to others or in employing them in the future.”
British Sugar
Plant Alterations
British Sugar
Plant Alterations
“The project undertaken needed to be carried out on a very tight timeframe, in a confined area with many obstructions but most of all safely. MJS managed to deliver on all fronts to a high standard.”
University of East Anglia
Residential Water Mains – New Storage Facility
University of East Anglia
Residential Water Mains – New Storage Facility
“MJS Projects took a proactive, pragmatic, no fuss approach to this complex cold water infrastructure upgrade, working with all stakeholders to deliver a high quality facility with minimum disruption.”